Primed the lower leg for the rearward entrance pillar today. Not much else done due to my MW arriving back from Thetford after visiting the North Norfolk Railway and Carlton Colville over the previous weekend.
9/7/2019
Work over the last few days: painting then fitting repair section to forward entrance pillar. Next, cutting and shaping a new, slightly wider pillar for rearward entrance pillar lower section, to accommodate the steel reinforcer that the entrance steps sheet metalwork is partially hung from. The pillar has a curved profile to the inner edge to allow the aluminium cladding to wrap around correctly. The first piece I made I copied from the only good lower side rod and didn’t realise it needed this profile and a rebate for the reinforcement, so I will use the first one I made further down the bus. All good practice!
Gave it a good soak in preservative.
Welded a swaged end into the piece of exhaust flexi to join the down pipe to the exhaust.
1/7/2019
Primed the repair section for the forward door pillar.
Drilled the mounting holes in the mahogany planks for the steps. I also drilled some packing strips for underneath the planks. Soaked the whole lot in preservative.
Painted the repair section joiner plate.