4/10/2020

This week’s work has been the manufacture of the right-angle brackets that reinforce the joint between the lower side frames and the body bearers.  Ten were required, each with four mounting holes 1/4″ clear.  These are attached to the side frames using recessed coach bolts then bolted through the body bearers and vertical reinforcement plates.  These are now mostly fitted with just three on the offside remaining to do, hopefully first thing tomorrow morning.

New brackets to reinforce the joints between the body horizontal bearers and the lower side frame at the rear.