1/11/2026

Work continued this week on fastening the roof sheet coving to the frame using countersunk screws through the top of the window frames, so bringing it all together nice and tightly.  By the end of the week I was on the third section, so more than halfway along.

25/10/2026

Back to work after a week off sick.  First job was to attend to the two rusty blind rollers in the route number box, sanding them off and applying a coat of no.1 rust beater.  Whilst this dried I started fastening back down the roof beading on the offside, where it had been lifted to allow access to the the frame for repair and to fit the windows.   I also started drilling fixing holes in the roof sheets/window frame interface preparation for the fitting of the rain deflector above the windows and applied a second undercoat to the destination box front.  The hole drilling was problematic, so slow; it continued for the rest of the week and remains to be finished.

11/10/2026

Started the week by cleaning down the areas stripped of paint last week, followed by applying a coat of aluminium primer to the underneath of the canopy and some white etch primer around the front destination screen.   I won’t use that again, though, as the fumes are noxious.  I continued painting, rescuing some undercoat from the remains in the Johnstones tin and used it for the front destination box around the screen and for some of the waist rail on the cab door and along the nearside.  I noticed some minor damage to the N/S waist rail beading, which needs attending to, so I left that section for now.  At this point in the week, illness struck so work was temporarily halted.