Removed the entrance steps today.
Monthly Archives: March 2019
11/3/2019
Removed the forward-facing window above the front bulkhead and then cut out the rotten steel sections below the window.
10/3/2019
Works today was limited but involved removal of the beading around the front bulkhead window, partially achieved and removal of the brass screws holding the left-hand side of the window frame to the woodwork. Hopefully the window will be out tomorrow and I can deal with the steelwork.