21/12/2018

The bracket that joins the rearmost entrance pillar to the cantrail was cut out of galavanised 1/8″ plate today.  All but the last two bays of the nearside framing above the floor level were treated with Ronseal wood preserver; this requires three coats at 24 hour (approx) intervals then a good long drying period before the wood can be primed.