Started the week by grinding off the welds on the front mud wing, revealing a few pinholes along the way, most of which I managed to weld up succesfully. The results look very good, so far. A few other odd jobs included installing the remaining screws in the horizontal beading where the holes had become enlarged and needed padding out. Attention then turned to reassembling the MW nearside rear axle and starting work on the offside, which required a lot of cleaning down. In between I continued work on the new battery boxes for HUO.