30/3/2020

Painstaking manufacture of various bits of wood have been the order of the day today, including the spacer block between the RH boot door pillar and the corner pillar and the final pieces of the corner boot floor support and perimeter rail.  I should be able to trim this to final shape tomorrow, for which I have made a cardboard template from the good side.

Also today I cut the wooden piece that forms the boot door abutment on the hinge pillar.  In the process of this I came to the conclusion that the pillar itself is not quite the right profile, which means I will have to add some thin lamination to build it up so I can sand it back to the right shape.  More time lost!

Damage to the base of the first OS pillar

Damage to the base of the first OS pillar, showing gusset plate and corner timbers removed,