Tag Archives: body frame

19/12/2021

This week’s work summary is once again focused on the offside frame.  The panel to the immediate rear of the front wheelarch was removed  to enable frame repairs to continue; this included the step ironwork for the cab entry.  All the side-rod lower extensions have been removed, a small amount of heat being required to release the the through bolts that pass through the ends of the floor bearers.  Exposed metalwork above the floor line had been treated with Vactan.  A removable section of the frame around the fuel tank filler has been unbolted to allow access to other parts that needed to be replaced and to allow easier removal of the fuel tank.

All of the window verticals and the waist rail have now been dowelled and all rust screws and nails hopefully removed.  The horizontal rail above the windows remains to be finished and painted.  The new woodwork of the wheelarch frame has been painted, along the with the sections of the frame joints that are awaiting new flitch plates.  The remaining flitch plates,  including the wheelarch reinforcement have been made this week and are in the process of being painted ready for fitting.   I also removed the beading above the (incorrect) cab mudwing.  I had hoped to save this and reuse it but at first sight it appears too far gone.

Cab entry step, kick-plate and beading.

10/12/2021

The lack of recent posts belies the basic monotony of current work on the offside frame.  Mostly it has been the removal of rusty screws and nails from the frame above the floor line. This has progressed as far as the cab door and is virtually complete in terms or plugging screw and nail holes with dowels.  The horizontal framing above the window openings has received some new timber to replace the odd bit of wet rot but this needs further attention and screw removal before it is finished.  An emerging fact is the offside frame has been much less carefully finished than the nearside; stupidly long screws and large nails have been used to fix the panels. On the positive side, above the floor it is generally in good condition.  The rear wheelarch has been repaired with new timber exactly as it was and naturally this is quite different from the nearside.  The next job when the upper frame is complete will be removal and refurbishment of the fuel tank, which appears to be the wrong tank.

New timber in offside rear wheelarch frame.

Dowels replacing rusty screws and nail holes in offside framing.

8/11/2021

I can’t believe it’s a month since I last recorded any progress.  However, there has been progress; lots of rusty screws have been winkled out of the offside framing, several rust-eaten flitch  plates have been removed and the first three replacements manufactured.  The emergency door hinges have been freed up, de-rusted and prepared for painting. The frame around the emergency door opening has had all the rusty screw and nail remains removed and the holes dowelled.   A new steel plate for the top right corner of the door opening has been manufactured and is ready for installation.

More lower side panels have been removed and the fuel tank exposed, this will need to be dropped and cleaned ready for  treating any rust and repainting.

Most recent work (today and yesterday) has been cutting out rotten timber framing above windows 3 and 4 apertures.  I cut some Iroko this afternoon in preparation for repairing this section.

Heavily-corroded flitch plate at joint between wast rail and cab door frame vertical.

Corrosion in the cab step.