Tag Archives: window frame

2/11/2018

Finished most of the welding on the second window frame, the majority of it was done yesterday.  Ground down the welds but there are one or two holes that remain to be filled.  Removed the glass, which turns out to be laminated,  and the rubber which is COH Baines reference IRS0011

23/10/2018

Finished removing the rain deflector from above the nearside windows.  Removed the second window, this will require some more complex fabrication than the first but looks repairable.

Reconstruction is becoming clearer now – waist rail panels first, then windows and finally lower panels when the frame has been repaired.