18/7/2019

The last three days have been concerned with assembling and fitting the entrance steps, a job which is largely complete.   I also cut the wooden finisher for the lower step from an undamaged section of the ash guard rail from the nearside. Tasks that remain are painting the sheet metalwork, fitting and painting the lino, fitting and painting the wooden lower step finisher and finally the nosings.   The view below shows the wooden steps fitted, awaiting the riser panel.

Metalwork for step bay attached to the body

Metalwork for step bay attached to the body

 

 

 

 

 

Riser panel fitted

Riser panel fitted