12/03/2023

Work this week has continued in the cab area.  All the aluminium has had a coat of primer.  The corroded steel stress panel has been copied and the outer side has been primed.  All holes have been drilled wth the exception of those for the bracket that supports the indicator switch.  All the remaining window uprights have been stripped ready for chrome vinyl wrap to be applied.