26/7/2021

Work last week was limited by other commitments but I did succeed in  fitting the rain deflector above the windows on the nearside.  This is now properly fixed to the wooden “cheeses” on each window pillar and to the cant rail.  It needs some attention to get the lower edge straight.  Today I have been making the beading for the window pillars.