Yesterday and today were spend manufacturing a rather complex shaped piece of timber to repair the siderod just aft of the NSR wheelarch. This needs to provide location for the boot floor perimeter rail and the lower perimeter rail along the rear of the bus. This piece is about ready to be installed but requires a little more adjustment and cutting to suit the body tumblehome.