13/12/2019

Back on track now after discovering (by breaking it) that the side window glass is ordinary plate. All replacement glass will be toughened but I can’t afford to wait to replace it all so I shall use what I have  for now.  Yesterday was spent preparing an unbroken lower with the top bar from tbe first effort.  This and the droplight were installed in the side bars today and held in place with lightweight ratchet straps whilst the silicone glazing compound sets.

Refurbishment of a second set of sidebars filled up the rest of the day, including a repair to the aluminium casting where a rivet had come loose, drilled through and replaced with a 6BA countersunk screw and a nut recessed and staked to the brass channel. An invisible but nevessary repair.   All good.  New chrome vinyl and felt applied to one bar.  I need to refine the felt fitting process further as it currently produces too much excess.  Removing the protective paper only from the bottom section first seems like the way to proceed.

Glazing assembled ready for fitting in the frame.

Glazing assembled ready for fitting in the frame.