31/10/2019

Work continues on the window pans.  Today was spent fabricating the lower horizontal no.4 and the end of the afternoon I cut out the material for the corner cladding plates, these can be welded tomorrow then all three of latest lower horizontals will be complete.  If time allows I will make the upper horizontals as the correct size material to make them in one piece (though two halves due to length) is in stock now.