The heatwave continues but I managed to complete the second boot door and now both are in red aluminium primer. Concurrent with this work has been the preparation of the original pyramid iron strips for the entrance floor.
Category Archives: AEC Regal
8/8/2020
The heatwave continued today though not quite as bad as yesterday and I managed to complete the right-hand boot door and prime it. I also sorted out the pyramid strips for the entrance floor and cleaned and Vactan’d the first one. Last part of the day I applied filler to the left-hand boot door for rubbing down tomorrow.
7/8/2020
It was very hot here today, reaching 39C in the shade. However, I managed to paint the new lino by the entrance in the correct shade of brown over the red floor paint. I then carried on filling and sanding imperfection in the RH boot door.