16/04/2023

The newly fabricated step section has been installed and work in the cab has continued with rubbing down the brown undercoat and recoating in places.  The floor strips for the cab entrance were derusted and painted, one new piece had to be made due to rot but the curved section was treated by trimming off the rotten 3/8″.    These were then fitted and primed.  The step was finished with a piece of chequer plate.