12/03/2023

Work this week has continued in the cab area.  All the aluminium has had a coat of primer.  The corroded steel stress panel has been copied and the outer side has been primed.  All holes have been drilled wth the exception of those for the bracket that supports the indicator switch.  All the remaining window uprights have been stripped ready for chrome vinyl wrap to be applied.

6/03/2023

Work has progressed well during the last week.  Cab steelwork is all primed.  Engine fan has been reassembled, painted and fitted to the engine; it is clear this is the correct size fan.  I cut, drilled , primed and fitted a replacement vertical edging strip for the destination box access hatch in the cab to replace the rusty and bent original.   The “Low Racks” labels for the seat backs  arrived and look perfect.