Category Archives: AEC Regal

2/5/2020

Most of the last two days have been taken up with fitting the replacement steel stress panel to the front of the boot framing.  To get this in place was like doing a chinese puzzle,  since it was too long to be inserted through the wheel arch openings it had to fed through from the boot.  Having removed both NS and OS wheel well covers made this a little easy, providing the odd half an inch here and there of maneuvering space.   Getting it in place and ready for fitting took the best part of a day, then it was necessary to drill the holes in the frame for the carriage bolts (upper frame and floor cross bearer) and the ordinary bolts that go through the flitch plated from inside the boot.  The stress panel was attached central cross frame with ordinary stainless steel round-head wood screws.

29/4/2020

Assembled the metalwork to the rear of the OS wheelarch today, this took most of the day.   Then I drilled and countersunk the screw holes in the OS boot upper liner panel to make it easier  to fit once the stress panel is in place.   The last part of the day was spent cleaning  and derusting the metal gangway support in the boot.

28/4/2020

I painted with aluminium paint the underside of the floor and the body frame primed yesterday in preparation for assembly of the two new steel flitchplates I made over the last few days.  I also painted in workshop grey the filler piece that goes between the two steel plates.

I fitted the timber support for the NS inner wheelarch as my last job of the day.

OS edge of the boot floor with the rotten perimeter rail removed and repaired side pillars.

OS edge of the boot floor with the rotten perimeter rail removed and repaired side pillars.