Removed entrance steps. Started to prepare front steel bulkhead for paint, filling over the welds.
Category Archives: AEC Regal
22/4/2019
The last few days have been spent as follows: straightened up the cut edge of the steel roof reinforcement in the roof above the entrance door ready for welding in new steel. Cut new steel for the hole. This involved adding a curve profile from flat to match the roof profile. Welded repair section into roof. Trimmed welds with angle grinder. Next, I drilled and countersunk holes to secure roof repair to the wood frame. Secured with stainless no. 14 screws .
15/4/2019
Finished scewing the steel front bulkhead to the frame with countersunk ss no.14 screws. Still stripping paint from around the window area using heat gun.