All posts by Nigel

4/5/2020

Continued to work on the boot lower frame rail, cutting out for the side rod joints.  As with the NS frame rail it takes a lot of trial fitting before it lines up with everything, but it was very close by the end of the afternoon today.

Replacement OS perimeter rail for the boot

Replacement OS perimeter rail for the boot

2/5/2020

Most of the last two days have been taken up with fitting the replacement steel stress panel to the front of the boot framing.  To get this in place was like doing a chinese puzzle,  since it was too long to be inserted through the wheel arch openings it had to fed through from the boot.  Having removed both NS and OS wheel well covers made this a little easy, providing the odd half an inch here and there of maneuvering space.   Getting it in place and ready for fitting took the best part of a day, then it was necessary to drill the holes in the frame for the carriage bolts (upper frame and floor cross bearer) and the ordinary bolts that go through the flitch plated from inside the boot.  The stress panel was attached central cross frame with ordinary stainless steel round-head wood screws.