Removed the remaining screws from the angle-iron floor support by the entrance. Removed as much corrosion as possible then checked that it was structurally sound. Gave all of the steelwork in this area a good coat of Vactan ready for oxiding tomorrow or Monday.
Last job of the day was to cut the top step to size from a piece of mahogany.