4/1/2020

Today I completed the metal work for the upper horizontals for the last three window frames.  All the parts are present now ready to be welded together tomorrow.

Using an old frame as a jig for a new one

Using an old frame as a jig for a new one

 

Corner piece that part of the inner frame that abuts the glass.

Corner piece that part of the inner frame that abuts the glass.

 

3/1/2020

Finished folding the side verticals for the windows, only the top horizontals left to form now.  The rest of the day was spent tidying up the folds with a panel beating hammer to get crisp bend lines.  Had a visit from another bus-owner and his Dad but still managed to do most of the pieces, only two lower horizontals remain to be done tomorrow.

2/1/2020

Today I painted the pieces of woodwork for bay 2 in standard grey, these should be dry enough to assemble tomorrow.  After that I finished the inner parts of the last three window frames and started making the sheet metal for the out part of the window frames.