8/11/2019

Yesterday and today were spent completing the second window frame.  This was a laborious process of tack welding and trial fitting, however I made a frame jig which holds the sides and bottom horizontal in the correct position for welding the top horizontal into place and this has proved very successful.

Lower horizontal being assembled

Lower horizontal being assembled

 

2/11/2019

Very frustrating session trying to fit vertical side pieces and horizontals to the second window frame.  I’m beginning to think the first one is better than I thought.