Continuing with window frame construction today, I welded the rear flange to the top section of the second frame today. I also constructed a frame jig that will allow me to easily align and weld the top and sides together.
Monthly Archives: October 2019
17/10/2019
Started work on the second frame, folded the top front flange (two pieces) and the small half-inch inner flange (also two pieces). Welded the two front flange sections together and started to square the edge in the vice.