18/10/2019

Continuing with window frame construction today, I welded the rear flange to the top section of the second frame today.  I also constructed a frame jig that will allow me to easily align and weld the top and sides together.

17/10/2019

Started work on the second frame, folded the top front flange (two pieces) and the small half-inch inner flange (also two pieces).  Welded the two front flange sections together and started to square the edge in the vice.

12/10/2019

Completed fitting the Delrin blocks to the window frame today, then gave it a coat of undercoat ready for fitting up.    However I think this will need to wait now until I find the right rubber for the top of the frame.

20191012_171750