28/6/2019

Work over the last three days:  painting the metal work for the steps and surface filling,  silver on the chassis side and in red undercoat on the outside.

Replacement floorboards for the ones that were cut incorrectly have been cut, soaked in preservative, primed and painted grey.  They are ready for fitting as soon as a couple of extra screws have been added to the steel plate floor support to fasten it to the gearbox access hole frame.

The new  steel bracket for the side rode extension for the rearward door pillar has been fitted and the holes for bolting in the side rod have been checked for alignment.

The side rod extension for the rearward door pillar has been cut and sanded to shape, soaked in preservative and primed.

The forward door pillar has been cut to shape and is ready for preservative and painting.