16/2/2020

Today I fitted the siderod vertical aft of the wheelarch which required a lap joint with the good part of the original siderod.  The next job was to start to build the wheelarch timbering down to the siderod, which took quite a lot of trial fitting and adjustment using the wheelarch moulding to ensure the final shape was correct.    Almost all the parts have been made and assembly should be completed tomorrow.